BABIL 400 132kv GIS Rehabilitation Project

Locatin : Iraq - Babil .

Client : Linxon .

End User : MOE .

PEW Scope : 

Rehabilitation 400 /132 KV GIS / dismantle and install new 4X capacitor bank and 2X shunt reactors / 11KV Switchgear panels / control and protection system / Laying power and control cables /Installing warehouse for materials etc.

  • Civil Work

  • Mechanical work

  • Electrical work

  • I&c work

  • Steel sturacture work

Al-Diwaniya Power Plant– Upstream Air Cooling system

Location : Iraq-Al Diwaniya .

Client : MOE .

PEW Scope :

  • install Upstream Air-Cooling system for 4 Units GE Power 9E gas turbines, supply and install Service water pump System and to supply and install the 6” Main feed water header, and Four (4) 3” branches feeding the Water Injection Units.

  • Civil Work

  • Mechanical Work

  • Electrical Work

  • Piping Work

  • Steel support

  • I&C Work

Al- Haydaria Power Plant – Upstream Air Cooling system

Location : Iraq-Najaf .

Client : MOE . 

PEW Scope :

  • install Upstream Air-Cooling system for 4 Units GE Power 9E gas turbines and install Upstream Air-Cooling system for MAPNA gas turbine.

  • Civil Work

  • Mechanical Work

  • Electrical Work

  • Piping Work

  • Steel support

  • I&C Work